Ankhukhola Hydropower Company Limited ( AKJCL )
INTRODUCTION
Site is located in Dhading District close to 132 km from Kathmandu; Ankhu Khola is one of the major tributaries of Budhi Gandaki Nadi. The catchments area of Ankhu Khola is about 633 km2. The mean annual flow is estimated to be 58.38 cumecs. A design discharge of 34.5 cumecs having a probability of more than 40% has been considered.
BASIN CHARACTERISTICS
Site of the project is located at 28000’00”, to 28000’57”, N
in and 84054’00” to 84055’32″Eto 84055’32″E latitude and longitude
respectively. Proposed Intake structure has been impartially located at 70m
downstream from existing Ankhu Khola Suspension Bridge. At Rigna bazaar,the
power house has been proposed at right bank of the river at Sisneri khet. The
proposed project shall generate average annual energy of 46.408 GWh.
Transmission of the generated power will be connect through 12 km long KV
transmission line to NEA Substation at Dhading Besi.
BACKGROUND
The contract is made between Ankhu Khola Hydropower Company
Ltd. (AKHC) and Welink Associates (P) Ltd. In association with Public
Consulting Engineers (P) Ltd. for the preparation of Feasibility Study of Ankhu
Khola Hydropower Project at Dhading District.
OBJECTIVES AND SCOPE
The main objectives of the Feasibility Study was identify and
confirm the best site, in the vicinity of the location established by the
previous reconnaissance level survey, for the development of a small hydropower
project on the Ankhu khola and to establish its technical and economic
viability for connection into National Grid . The study includes the selection
and arrangement of structures, optimization of the major structures and
determination of the optimal scale of development. Cost and benefit (financial)
analysis on the optimal development of the scheme.
As elaborated in the Terms of Reference the scope of work for
undertaking the feasibility study was consistent with the requirement for the
development of a small sized run-of-river hydropower scheme.
CAPACITY AND IT’S CONTRIBUTION TO THE NATION:
Previously the capacity was 7.0 MW but letter on it was
upgraded to 804MW. Now the installed Capacity has been calculated at 8.4MW.
Design discharge of 8.4 MW is 34.50m3/s. And its contribution to the Nation is
8.4 MW.