Barun Hydropower Company Limited ( BARUN )
Barun Hydropower Company Ltd. (Earlier Barun Hydropower Development Company Ltd) is a limited liability company registered under the Company Act 2063 with an Authorized Share Capital of Rs 60 Crores. It has a paid up 26.79 crore. The company was established in 2060/10/06 (Reg. No. 2065/9/26) with a mission to develop, own and operate hydroelectric project and converted into public limited in 2066
The company has in operation of 4.5 MW hydroelectricity
project known as "Hewakhola Hydropower Project" at Sankhuwashava
district.
Vision of the Company
“Brighten the nation by maximum utilization of water
resources and bring prosperity to people through hydropower development”
Mission of the Company
“To identify different size of hydropower projects in Nepal,
study, develop them and construct projects through peoples’ participation;
generate, operate and own the projects and sharing benefits with people” is the
mission of the company.
Date of Incorporation of Company: 2060/10/06
Company Registration number : 1154/065/066
PAN Number: 301617998
PPA Date: 2064/06/02
Date of Conversion into Public Ltd: 2066/03/31
Project Completion Date: 2067/09/30
Commercial Operation Date: 2068/04/21

Comments
Post a Comment